Proctor’s Theatre
Schenectady, NY
STS Steel was proud to fabricate and erect the much needed stage expansion
at this treasured theatre. Our close proximity to the site and experience building large trusses allowed
us to deliver the 90’ long 30-ton proscenium truss in one piece.
Structural Steel Tonnage: 535 Tons
Architect: SRG Architects
Engineer: Ryan Biggs Associates
Construction Manager: AKW Construction Consulting
|