Taintor Gates at Lock C1 of the Champlain Canal
Six large, curved gates weighing 10 tons each pivot on large arms to regulate the water level on
the Hudson river. STS fabricated each gate in one piece then sandblasted and applied a three coat
finish prior to shipment. The arms were reconditioned at STS Steel's plant to preserve the
historical features of the riveted construction. Installation was performed by the General
Contractor, C.D. Perry. |